 |
|
|
|
|
|
|
| Resources |
|
Click on any of the pictures below to
view more like it!!! |
| |
|
|
| |
|
 |
|
P-Series
Assembly |
|
Step 1 |
 Pour a simple floating concrete perimeter with a
channel to receive the arches. |
|
Step 2 |
 Assemble arches on the ground. The precision-made arch
panels bolt together quickly and easily with only one-size bolt and
fastener. Caulking and neoprene washers ensure a weather-tight seal.
|
|
Step 3 |

Slide arches into foundation channels and raise upright.
|
|
Step 4 |
 Arches are raised and progressively joined together.
Precision engineering ensures a snug fit. |
|
Step 5 |
 Seal the arches at their base with concrete |
|
Step 6 |
 Any number of accessories or components can now be
added to finish off your building: endwalls, insulation, man or garage
doors, windows, ventilators, and translucent fiberglass panels
(skylights).
Can be erected in as little as two days with just four men!
NO MATTER WHAT YOUR NEEDS:
COST MINUS LABOR EQUALS AFFORDABILITY! |
|
|
|
|
|
 |
|
 |
|
| |
| Copyright © 2006 American Steel Span All Rights
Reserved. |
|
|
|
|
 |